Executive Program Status

IMMIGROW NEXT

Domain + Workflow + Intelligence Re-architecture

Program State

ON TRACK — FOUNDATION PHASE

Last Updated

September 27, 2026 at 09:00 AM UTC

Active Stage

01 · Slice 1.1 — Secure Foundation

Current Focus

Slice 1.1 — making GitHub the complete source of truth, proving a fresh database rebuilds from zero, and closing tenant-isolation drift before the new domain architecture begins.

01

Live Delivery Sequence

Objective

Prove the entire platform can be rebuilt from a clean checkout: schema, seeds, configuration, and security posture — with no hidden production-only state.

Current State

Foundation work is underway. Migration history is being consolidated, environment drift is being catalogued, and tenant-isolation policies are under review and repair.

Blockers / Risks

  • Legacy production-only configuration must be catalogued before it can be eliminated

Completed Work

  • Full audit of production-only state and undocumented configuration
  • Migration baseline established for zero-to-database rebuilds
  • Tenant-isolation gap analysis across all row-level security policies

Active Work

  • Consolidating migrations into a clean, replayable chain
  • Repairing row-level security drift between environments
  • Documenting every secret, env var, and external dependency in-repo

Next Actions

  • Complete fresh-environment rebuild rehearsal end to end
  • Close remaining tenant-isolation findings
  • Sign off Slice 1.1 exit criteria and open the Domain Contract

Evidence / Notes

  • Rebuild rehearsal script runs from a clean clone
  • RLS audit spreadsheet tracking every table and policy
  • Exit criteria: fresh DB → full schema → seeded → tests green
In ProgressNextQueued

02

Executive Snapshot

Active Stage

01 · Slice 1.1

Next Stage

02 · Domain Contract

Stages Sequenced

08

Open High Risks

02

Immigrow Next is a staged rebuild, not a big-bang rewrite. Security and reproducibility come first; domain semantics second; workflow automation third; AI only after the underlying world is clean enough to query deterministically. The visible next-gen product architecture begins with the Domain Contract once Slice 1.1 closes.

03

What Changed Since Last Update

  • Slice 1.1 opened as the active delivery stage; all later stages formally sequenced.
  • Tenant-isolation gap analysis completed across row-level security policies.
  • Migration baseline established — fresh-database rebuild path is now defined.

04

Architecture — North Star

  1. 01Person is fundamental.
  2. 02Person ≠ Login ≠ Immigration File.
  3. 03File / Matter is the operational workspace.
  4. 04Facts and evidence are canonical and reusable, with provenance.
  5. 05Requirements and checklists are generated from rules.
  6. 06AI sits on top of the clean domain through permission-aware deterministic tools.
  7. 07Build the world correctly. Then make it intelligent.

System Shape

People side

Firm→People→Relationships→Facts→Evidence

Operational side

Firm→Files→Parties→Requirements→Intake→Documents→Forms→Filing / Readiness

Intelligence Fabric — permission-aware AI spanning the system

AI is layered on top of the clean domain through deterministic, permission-aware tools — never inside the domain itself.

05

Risks & Blockers

high

Hidden production-only state

Configuration or data that exists only in production would make rebuilds non-deterministic and block the Domain Contract.

Mitigation

Full catalogue in progress; every finding is either moved into GitHub or formally decommissioned before Slice 1.1 closes.

high

Tenant-isolation drift

Row-level security policies have drifted between environments, creating potential cross-tenant exposure.

Mitigation

Gap analysis complete; repairs are being applied and locked behind rebuild-time verification.

medium

Sequencing pressure

Pressure to start visible product work before the foundation is proven would re-introduce the drift this program exists to eliminate.

Mitigation

Stage-gate discipline: the Domain Contract does not open until Slice 1.1 exit criteria are evidenced.

06

Recent Milestones & Next Actions

Recent Milestones

  1. Program Command dashboard liveSeptember 27, 2026

    Executive status surface established as the standing twice-weekly communication channel.

  2. Tenant-isolation gap analysis completedSeptember 24, 2026

    Every table and RLS policy audited; repair list finalized.

  3. Migration baseline establishedSeptember 20, 2026

    Zero-to-database rebuild path defined and scripted.

  4. Immigrow Next program charteredSeptember 15, 2026

    Staged rebuild approved: security/reproducibility first, domain second, workflow third, AI last.

Next 3 Actions

  1. 1Complete the fresh-environment rebuild rehearsal end to end.
  2. 2Close the remaining tenant-isolation findings from the RLS audit.
  3. 3Ratify Slice 1.1 exit criteria and schedule the Domain Contract kickoff.

07

Decision Log

September 15, 2026

Staged rebuild, not big-bang rewrite

Security and reproducibility first; domain semantics second; workflow automation third; AI only once the underlying world is clean enough to query deterministically.

September 15, 2026

Person is fundamental — Person ≠ Login ≠ Immigration File

Identity, authentication, and case files are separate concerns. Conflating them in the legacy system is the root of the drift being corrected.

September 20, 2026

GitHub is the complete source of truth

Any state that cannot be rebuilt from the repository is a liability. Hidden production-only state is being eliminated, not documented around.

September 24, 2026

No percentage-based progress reporting

Executive reporting uses evidence-based statuses and qualitative indicators only — precision without evidence is fiction.

08

Executive Brief Archive

Twice-weekly executive briefs are archived here as PDFs. Entries appear with date and summary as soon as they are issued; the download link is attached when the PDF is supplied.

Immigrow Next Executive Product Brief — September 2026

September 27, 2026

Program charter, staged rebuild rationale, Slice 1.1 scope, and the north-star domain architecture.

PDF forthcoming